Evening Robot Group Agenda (9/7)
Jeremy
- Dropping the Shipment Payload for Mission 1
- Build a fork for Tube Module
Jon Jon
- C-Shape baskets for satellite orbits
- Strengthen Food Production Attachment
Sophia
- Build a basket for the 3-D printing red brick, bring the brick back to base
- Build weight for Crater Crossing Mission
Zoey
- Drop Mineral Sample for 3-D printing mission
- Build an arm to throw the Crater Crossing weight
Please try to finish all of the work
If you have finished your work, help other people out or work on the Observatory Mission.
Friday, September 7, 2018
Thursday, September 6, 2018
Programming Mindstorms
FLL gives the following links for Mindstorms programming tutorial. If you are not familiar Mindstorms programming, give a try.
Programming Mindstorms with Matt Birkel
https://www.youtube.com/watch?v=1wSt959mrFs
Programming Mindstorms with Matt Birkel
https://www.youtube.com/watch?v=1wSt959mrFs
Tuesday, September 4, 2018
Monday, September 3, 2018
Robot evening team time line
Evening Robot Meeting Agenda
Missions to complete
- Space Travel (2 Payloads)
- Solar Panel (away)
- 3-D Printing (brick on planet)
- Crater Crossing
- Extraction (Gas in base)
- Tube Module (only docking)
- Excersize Machine (the pointer is in grey; the bar is lifted)
- Food Production
- Escape Velocity
- Satellite Orbit (all 3)
- Observatory
Expected Points: 252
Sat, September 1
Jeremy built mission one mechanical solution to tip first track section
JJ built the mechanical Food Production solution
Zoey worked on the base and built the basket for Extraction with Sophia
Sat, September 8
Jeremy will build the motorized attachment to lower the payloads for M1 and attach it to the robot
JJ will build baskets for the Satellite Orbit
Zoey and Sophia will work on the strength bar mission
Sat, September 15
- 3-D printing
Refinement of the
- food production attachment
- basket for satellite orbit
- basket for extraction
Sat, September 22
- Escape Velocity
- Crater Crossing
- Observatory
- Tube Module
Sat, September 29
- Escape Velocity
- Refinement of Crater Crossing and Tube module
- 3-D printing basket to move to planet
- If time allows, food production water sample
Missions to complete
- Space Travel (2 Payloads)
- Solar Panel (away)
- 3-D Printing (brick on planet)
- Crater Crossing
- Extraction (Gas in base)
- Tube Module (only docking)
- Excersize Machine (the pointer is in grey; the bar is lifted)
- Food Production
- Escape Velocity
- Satellite Orbit (all 3)
- Observatory
Expected Points: 252
Sat, September 1
Jeremy built mission one mechanical solution to tip first track section
JJ built the mechanical Food Production solution
Zoey worked on the base and built the basket for Extraction with Sophia
Sat, September 8
Jeremy will build the motorized attachment to lower the payloads for M1 and attach it to the robot
JJ will build baskets for the Satellite Orbit
Zoey and Sophia will work on the strength bar mission
Sat, September 15
- 3-D printing
Refinement of the
- food production attachment
- basket for satellite orbit
- basket for extraction
Sat, September 22
- Escape Velocity
- Crater Crossing
- Observatory
- Tube Module
Sat, September 29
- Escape Velocity
- Refinement of Crater Crossing and Tube module
- 3-D printing basket to move to planet
- If time allows, food production water sample
Subscribe to:
Posts (Atom)