Evening Robot Meeting Agenda
Missions to complete
- Space Travel (2 Payloads)
- Solar Panel (away)
- 3-D Printing (brick on planet)
- Crater Crossing
- Extraction (Gas in base)
- Tube Module (only docking)
- Excersize Machine (the pointer is in grey; the bar is lifted)
- Food Production
- Escape Velocity
- Satellite Orbit (all 3)
- Observatory
Expected Points: 252
Sat, September 1
Jeremy built mission one mechanical solution to tip first track section
JJ built the mechanical Food Production solution
Zoey worked on the base and built the basket for Extraction with Sophia
Sat, September 8
Jeremy will build the motorized attachment to lower the payloads for M1 and attach it to the robot
JJ will build baskets for the Satellite Orbit
Zoey and Sophia will work on the strength bar mission
Sat, September 15
- 3-D printing
Refinement of the
- food production attachment
- basket for satellite orbit
- basket for extraction
Sat, September 22
- Escape Velocity
- Crater Crossing
- Observatory
- Tube Module
Sat, September 29
- Escape Velocity
- Refinement of Crater Crossing and Tube module
- 3-D printing basket to move to planet
- If time allows, food production water sample
No comments:
Post a Comment